Tree services

Tree removal across Melbourne.

Tree assessment, removal method, access, permit assumptions and clean-up set out in writing before work is scheduled. Regular service across Melbourne and $20M public liability.

Illustration of a climbing arborist working a mature eucalypt with a ground arborist tending the lowering line
Scope agreed before work beginsSingle jobs and combined projectsAcross Melbourne
What we do

Assessment, permits, removal, clean-up.

Most healthy mature trees are worth keeping. Storm damage, structural defects, severe decline, an approved building footprint and conflicts that cannot reasonably be managed are common reasons to assess removal. The recommendation is based on the tree, surrounding targets, proposed use of the site and available retention options.

Where removal is the right call, the method depends on the site. An open backyard with no targets can take a straight fell. A constrained site with structures, powerlines, or protected adjacent trees needs a sectional dismantle with rigging. Chipping, wood removal and clean-up are set out in the agreed scope.

Since 15 September 2025, Clause 52.37 has added a state planning-permit trigger for qualifying canopy trees in specified residential zones and site situations. Planning overlays, native-vegetation provisions, existing permit conditions and council requirements can apply separately. We check the available controls and identify the supporting information required; council remains responsible for the permit decision. See our Clause 52.37 guide for the measurements, lot-position rules and exemptions.

See the work behind the service.

Google reviews

Customer feedback on tree removal

5.0from 11 Google reviews

Read our Google reviews
“Fantastic job removing a large dead tree.”
Ethan·Tree removal · Glen Waverley
How we work

The standard process.

Step 01

Send photos and the address

Include the tree, its surroundings and access. Tell us why you are considering removal.

Step 02

Assess the site

We discuss retention options, the proposed work and permits or other information required.

Step 03

Agree the written quote

The quote records the scope, price, access, clean-up and any permissions still needed. Timing is confirmed for the job.

Step 04

Carry out the agreed removal

Required permissions are confirmed before work proceeds. Material handling and clean-up follow the agreed scope.

Council coverage

Property controls and permit pathway.

A tree over 5 metres is not automatically protected. Clause 52.37 applies only when its zone, measurement, site-position and work tests are met, and other controls can apply independently. We review the address and scope, explain what still needs confirmation and prepare supporting arborist information where required.

Glen EiraStonningtonBoroondaraMonashBaysideCaseyKnoxWhitehorseKingstonManninghamBanyulePort PhillipYarraMelbourne
Suburbs we cover

Regular work across Melbourne's east, south east, bayside and north.

Malvern EastCaulfieldCarnegieGlen IrisChadstoneMalvernPrahranHughesdaleOakleighBentleighElwoodEndeavour HillsBrightonHawthornCamberwellMount WaverleyAshburtonMurrumbeenaWheelers HillSurrey Hills
FAQs

The questions we get most.

Often, yes. Since September 2025, Clause 52.37 requires a permit for canopy trees (over 5m tall, trunk circumference over 0.5m, and canopy at least 4m wide, all three must apply) on vacant lots and near front or rear boundaries in most residential zones. Planning overlays (VPO, SLO, ESO, HO) and council local laws can also require one. We check all three layers for your address, write the arborist report, and lodge the application. Some canopy tree applications are eligible for VicSmart: a 10-business-day statutory assessment once the application is complete, depending on the full set of controls affecting the works.

Tree size, condition, access, equipment and the work required affect the quote. Send photos and the address so we can confirm the assessment needed. Stump work, material removal and any supporting report are identified in the agreed scope.

Work near powerlines needs assessment and coordination with the relevant network operator before proceeding. Include the powerlines and surrounding area in your enquiry so those requirements can be considered.

Yes. Stump grinding can be included as an agreed part of the project. Tell us how the area will be used afterwards so grinding, material removal and any further preparation can be discussed.

If no permit is required, scheduling depends on crew, equipment and site access. Permit work cannot be scheduled until the required permission is in place; council timing varies with the pathway and whether the application is complete. Urgent hazards are triaged by phone.
Request a quote

Tell us about the job.

Tree work, landscaping or a project that needs both. Tell us what you have in mind and we will discuss the next step, including a site visit if needed.

0468 077 782Email Hilly's TreesMon to Fri 5.30am to 4.30pm; Sat 8am to 3pm

Request a quote

Leave your details and we’ll contact you to discuss the work. Fields marked required need to be completed.

If you leave this blank, we will use your phone number and no email confirmation will be sent.

Tell us about the tree, why you are considering removal, access and any permit information you have.

Photos are optional. After sending your enquiry, you can text photos to 0468 077 782 or email photos to Ashley. Attach the photos in your messaging or email app, include your name and suburb, then send them from that app.

By sending, you agree that Hilly's can contact you about this work.

Or call 0468 077 782. Mon to Fri 5.30am to 4.30pm; Sat 8am to 3pm.

CallText